TxDOT Project

Location: From Bell St to S Shepherd
Project: Install CTMS 
Status: Construction Project #: CM 2007(769)
From: 2/11/2009 To: 12/31/2009
Key Map Page: --


More Details

Project Complete: 4th 09 Contract #: 27-13-162
Contractor: Florida Traffic Control Contractor: --
Designer: Gaynor Engineer: GEE
Designer: Gaynor Maint. Engineer: --