TxDOT Project
Location:
From 0.40 Mi W of Normandy St to 0.48 Mi E of Normandy St
Project:
Construct Interim Grade Separation with Two 3-Lane Frtg Rds
Status:
Construction
Project #:
HP 2006 (708)
From:
2/11/2009
To:
6/30/2010
Key Map Page:
--
More Details
Project Complete:
2nd 10
Contract #:
28-2-44
Contractor:
Williams Bros Const Co
Contractor:
--
Designer:
Cardinal
Engineer:
ALLEN
Designer:
Cardinal
Maint. Engineer:
--