TxDOT Project
Location:
Milby to Lockwood
Project:
Light Rail: Milby to Lockwood
Status:
Construction
Project #:
EE_2A
Construction Starts:
10/1/2008
Construction Ends:
8/17/2009
Key Map Page:
--
More Details
Project Complete:
--
Contract #:
--
Contractor:
--
Contractor:
--
Designer:
--
Engineer:
VOLK
Designer:
--
Maint. Engineer:
--